Long Railway Tunnels in Japan (over 10 km meters in length - 2004/7)


No.NameLineLength
(km)
Depth
(m)
TrackOpening yearRema
rks
1SeikanTsugaru-Straits53.85500D1988
2HakkodaTohoku Shinkansen26.45540DC
3Iwate-ichinoheTohoku Shinkansen25.81200D2002
4IiyamaHokuriku Shinkansen22.22325DC
5DaiShimizuJohetsu Shinkansen22.221,300D1982
6SinKanmonSanyo Shinkansen18.71460D1975
7RokkoSanyo Shinkansen16.22440D1972
8HarunaJohetsu Shinkansen15.35170D1982
9GorigamineHokuriku Shinkansen15.17620D1997
10NakayamaJohetsu Shinkansen14.86410D1982
11HokurikuHokuriku13.87490D1962
12SinShimizuJohetsu13.501,200S1967
13AkiSanyo Shinkansen13.03530D1975
14ChikushiKyushu Shinkansen11.86515DC
15KitaKyushuSanyo Shinkansen11.75270D1975
16FukushimaTohoku Shinkansen11.70230D1982
17KubikiHokuriku11.35230D1969
18ShiozawaJohetsu Shinkansen11.22150D1982
19ZaoTohoku Shinkansen11.21170D1982
20AkakuraHokuetsu10.47450S1997

Track means number of track that main tunnel has in standard cross-section.
S: single track, D: double tracks
C=under construction




Long Roadway Tunnels in Japan (over 5000 meters in length - 2004/7)


No.NameRoadLength
(km)
Depth
(m)
Usable
width(m)
Opening yearVentila
-tion system
1KANETSU
(Up)
NE(KAN ETSU)11.051,1907.01991PSL
2KANETSU
(Down)
NE(KAN ETSU)10.931,1907.01985PSL
3HIDANE(TOKAI HOKURIKU)10.741,0157.0
C
AL
4TOKYOWAN AQUA(Down)NH4099.55157.01997PSL
5TOKYOWAN AQUA(Up)NH4099.54157.01997PSL
6ENASAN(Up)NE(CHUO)8.659507.01985PSL
7ENASAN (Down)
NE(CHUO)8.499507.01975T
8SHIN KOBE No2. (South)MR(KOBE)7.173456.51988L+T
9SHIN KOBESHIN (North)MR(KOBE)6.913156.51976T
10KARISAKANH1406.629006.51998PSL
11HIGO(Down)NE(KYUSHU)6.346007.01989PSL
12HIGO(Up)NE(KYUSHU)6.336007.01999PL
13KAKUTOH(Up)NE(KYUSHU)6.253507.01995PSL
14KAKUTOH(Down)NE(KYUSHU)6.254157.0CPL
15HAKAMAGOSHINE(TOKAI HOKURIKU)5.936407.02000PL
16HANNA(East)MR(DAINI HANNA)5.585407.01997PSL
17HANNA (West)NH3085.585407.01997L
18KANPUSANNH1945.439006.51999L
19OMACHIKANDEN5.379856.01960L

All of tunnels above-mentioned have two lanes.
NE=national express road、NH=national motorway、LR=local road、MR=main road
C=under construction
A:Optional System,P:Using electric dust collector,S:Using shaft
L: Longitudinal ventilation system T: Transverse ventilation system





Trend of Construction Investment


The total length of tunnels under construction in 2003 was 1,164km.
The chart show the amounts of tunnel works under contract in every five year from 1985 to 2000, and 2003, categorized by tunnel purpose of usage.
Benefiting from active social capital construction in the 90's, the amount of works under contract showed a rising trend, and since 1995 a level of euro23 billion or more has been maintained mainly in railway and road tunnel projects.